CUSTOM OUTDOOR FURNITURE FROM CHINA — PROJECT BRIEF SOLAIREVA Outdoor Project Desk | Published 29 September 2026 Guide: https://www.solairevaoutdoor.com/blog/custom-outdoor-furniture-manufacturer-china/ Enquiry: https://www.solaireva.com/contact Use this editable checklist for a supplier discussion. It is not a quotation, order acceptance, engineering specification or production approval. Mark unknown details: SUPPLIER PROPOSAL REQUIRED. PROJECT CONTEXT Buyer/company: Buyer role (hotel, restaurant, importer, brand, designer, contractor): Project/collection name: Destination and intended use areas: Exposure and operational conditions: Site access, handling and delivery constraints: Requested development and delivery milestones: Primary contact: DEVELOPMENT ROUTE AND DELIVERABLES Route (catalogue adaptation, buyer-design OEM, supplier-design ODM): Private-label requirements, if applicable: Existing model or authorised reference files: What the buyer supplies: What the manufacturer proposes or develops: Files, samples and documentation to be delivered: Open feasibility questions: ITEM AND VARIANT RECORD — REPEAT FOR EACH ITEM Item/model code: Quantity by variant and project area: Fixed dimensions, interfaces and layout requirements: Materials and finishes already selected: Choices open to supplier proposal: Frame, rope/rattan, cushion and hardware references: Branding, artwork and instructions: Assembly and packaging requirements: Current drawing/specification revision and date: Reference image notes (which feature matters): SUPPLIER REVIEW Engineering/sample contact: Production and component sourcing responsibilities: Relevant capability evidence requested: Proposed alternatives and reasons: Assumptions, exclusions and unresolved decisions: Material substitution procedure: QUOTATION SCOPE Development/engineering charge and included work: Sample charge, scope, shipping and revision allowance: Tooling/fixture requirement and arrangement, if applicable: Bulk unit price by item/variant: MOQ by model, material, colour and packaging variant: Branding/packaging setup and recurring charges: Inspection activities and costs: Trade term, named handover point and freight scope: Possible credits against a bulk order: Cost and schedule treatment of later changes: APPROVAL ROLES Appearance/material approver: Functional/site-fit reviewer: Commercial change approver: Production-release approver: Supplier contact communicating the current version: CHANGE AND DECISION LOG — REPEAT FOR EACH CHANGE Affected item and old revision: Requested change and reason: Revised drawing/material/sample reference: Cost, MOQ and timing impact: Function, packing and evidence to recheck: Repeat sample or test required: Decision, approver and date: Superseded files clearly marked: BULK-ORDER HANDOVER CHECK Approved drawings and specifications: Physical sample and colour references: Quantities and variant list: Labels, packing and assembly instructions: Agreed inspection references and acceptance decisions: Open issues resolved or explicitly held: First-production review plan: Development, production, inspection, shipment and site-delivery schedule: Written release reference and date: